Post-Construction Cleaning Bid Calculator
This page uses the same calculator to price a single project. Keep visits per week at 12/52: a month is 52 ÷ 12 weeks, so that is exactly one visit in the calculator's month, and the "monthly" bid price it shows is the price of the whole job. Enter a production rate that covers every pass combined.
Calculator
These starting rates are our own rough estimates, not an industry standard. Time your own crews and replace them. The post-construction starting rate here is 320 sq ft per labor hour. Pricing and bid-planning aid only, not financial, legal, medical or compliance advice.
A final clean after construction is not a recurring job. It is a one-time project, usually tied to a handover date, with layers of fine dust and residue that a regular janitorial visit never meets. The work tends to come in passes: a rough clean while the trades finish, a final clean before handover and a touch-up after the punch list. The condition of the building decides the hours, so two buildings with the same area can be very different bids.
What the starting numbers assume
- Interior surfaces: dust removed from ledges, sills, vents, fixtures and shelves, and cabinets wiped inside and out as agreed.
- Floors: swept and vacuumed to lift debris, then mopped or buffed as the flooring allows.
- Glass: interior windows and glass doors, with labels, stickers and paint spatter removed where it can be done without damaging the surface.
- Restrooms and kitchens: fixtures, counters and appliances wiped, and protective film removed where the owner wants it removed.
- A touch-up visit after the punch list, if it is in your scope.
- Not included unless agreed in writing: hauling construction debris, floor refinishing or sealing, exterior and high-reach window cleaning, pressure washing, and anything hazardous.
About the production rate. Our starting estimate is 320 sq ft per labor hour for all passes combined, which is 25 hours for 8,000 sq ft. It is by far the slowest of our nine estimates, because of fine dust on every surface, labels and film to remove, and repeated passes. It is a rough guess of ours with no published source behind it. A building that was swept daily during the build may run much faster. One with heavy drywall dust, paint spatter or concrete residue can run much slower. Walk the actual site, time a sample room through every pass, and replace this figure.
These starting rates are our own rough estimates, not an industry standard. Time your own crews and replace them.
What to walk and measure
Before you quote post-construction space, walk it with a notepad and a stopwatch. Tick items off as you go.
Worked example: an 8,000 sq ft tenant build-out, one final clean
Picture an 8,000 sq ft commercial tenant build-out with an open work area, private offices, two restrooms and a kitchenette, cleaned as one project with all passes counted, and $150 of flat equipment cost. The calculator opens with exactly these numbers, and because it uses 12/52 visits per week (exactly one visit in the month), the "monthly" bid price is the price of the whole job.
Inputs: 8,000 sq ft, 12/52 visits per week, 320 sq ft per labor hour, an hourly wage of $17.00, 20% labor burden, 10% supplies, 12% overhead, $150.00 of extras for the job and a 20% profit margin on price.
- Hours for the job: 8,000 sq ft ÷ 320 sq ft per hour = 25.00 hours.
- Visits in the calculator's month: 12/52 visits per week × 52 ÷ 12 = 1.00 visit, so the whole job counts as exactly one visit.
- Labor hours for the job: 25.00 × 1.00 = 25.00 hours.
- Labor cost: wages of $425.00 plus 20% burden of $85.00 = $510.00.
- Supplies: 10% of labor cost = $51.00.
- Extras for the job, your cost: $150.00. Direct cost so far: $711.00.
- Overhead: 12% of direct cost = $85.32.
- Subtotal cost: $711.00 + $85.32 = $796.32.
- Bid price for the job: $796.32 ÷ (1 − 20%) = $796.32 ÷ 0.8 = $995.40. Of that, $199.08 is the profit built in.
- Price per sq ft for the job: $0.124. Revenue per labor hour: $39.82.
Shown numbers are rounded for display only. The calculator carries full precision, so adding up the rounded figures by hand can be off by a cent.
What if your own timing is 20% slower?
Suppose your timed walkthrough shows your crew cleans 20% fewer square feet per hour than our estimate: 256 instead of 320. Nothing else changes, and the bid price for the job becomes $1,191.75, which is $196.35 more, or $0.149 per sq ft. That is why you time your own crews instead of trusting a default.
Questions about pricing post-construction cleaning
How do I use a monthly calculator for a one-time clean?
The calculator multiplies visits per week by 52 and divides by 12 to get the visits in a month. At 12/52 visits per week (about 0.2308) that comes to exactly one visit, so the labor hours, costs and price it shows are for the whole job, not for a month. Do not change visits per week unless you mean to price repeat visits.
What production rate do I enter when a job has several passes?
Work from total hours. Time a representative room through every pass you plan, add the minutes, and divide the room's square feet by the total time in hours. Use that as the production rate. It is lower than the speed of any single pass, because it carries all of them.
What if the building is dirtier than I expected?
Say in the proposal what condition the price assumes and what happens if it is worse, for example an hourly rate for extra time. The "revenue per labor hour" result in the calculator is a handy floor for that hourly rate, because it is what your price already earns for each hour of labor.
Should I quote this job by the square foot?
Use price per square foot only as a cross-check against your own earlier jobs, and build the number from hours. Two buildings with the same area can differ a lot in dust, debris and fixtures. The per-square-foot figure here is the price of the whole job divided by the area, not a monthly figure.
How do I allow for a late handover or extra trade work?
The calculator has no contingency line. If delays could cost you crew time, put your own estimate of that cost as a flat figure in the extras field, or enter a slower production rate. Agree in the contract how a schedule change is paid for.
Other calculators
- Office Cleaning Bid CalculatorWorkstations, restrooms, breakroom and trash, cleaned on a regular weeknight schedule.
- Church Cleaning Bid CalculatorSanctuary, fellowship hall, classrooms and restrooms, on a weekly rhythm with irregular events.
- Medical Office Cleaning Bid CalculatorExam rooms, waiting area, restrooms and extra wipe-down time. A pricing aid, not compliance advice.
- Gym and Fitness Center Cleaning Bid CalculatorWorkout floor, equipment wipe-down, locker rooms and restrooms, often six or seven nights a week.
- Daycare Cleaning Bid CalculatorMany small rooms, low surfaces, small-fixture restrooms and frequent sanitizing.
- Warehouse Cleaning Bid CalculatorBig open floors, a small office and break room, restrooms and dock doors, cleaned a few nights a week.
- Restaurant Cleaning Bid CalculatorDining room, bar, restrooms and kitchen floors, front and back of house, cleaned after close.
- School Cleaning Bid CalculatorFor contractors bidding on a school building: classrooms, long hallways and restrooms on a weeknight schedule.
New to price per square foot? Read the guide to price per square foot, with worked examples from these calculators.